Weba Chute Systems recently completed a project for an Iron Ore mine in Postmasburg, Northern Cape, South Africa, involving the supply of a conveyor to conveyor transfer chute. The client was concerned about degradation, spillage, and uneven belt loading due to the material specifications, which included bulk density of 2.6t/m³, lump size of 31.5mm, dry material, and a maximum throughput of 1400 tons per hour.